Report Prepared by: Valeria Renteria, Associate Planner, Development Services Department
Title
SUBJECT: Vesting Tentative Subdivision Map #25-0011 (“Virginia Smith Trust (VST) Phase 1D”) and Environmental Review #25-0036 (Categorical Exemption) initiated by applicant. Board of Education of the County of Merced, Trustee, property owner. This application involves a request to subdivide approximately 58.17 acres into 197 lots. The subject site is generally located on the east side of Lake Road, approximately 5,000 feet north of E. Yosemite Avenue, within Planned Development (P-D) #80, with a General Plan designation of Virginia Smith Trust Specific Plan (VST SP); *PUBLIC HEARING*
ACTION: Approve/Disapprove/Modify
1) Environmental Review #25-0036 (CEQA Section15162 Findings and Categorical Exemption)
2) Vesting Tentative Subdivision Map #25-0011
RECOMMENDATION
Planning staff recommends that the Planning Commission approve Environmental Review #25-0036 (CEQA Section 15162 Findings and Categorical Exemption) and Vesting Tentative Subdivision Map #25-0011 - “VST Phase 1D ” (including the adoption of the Draft Resolution) subject to the conditions in Exhibit A and the Findings and Considerations in Exhibit C of Draft Resolution #4177 at Attachment A of this report (“Planning Commission Staff Report #25-1071”).
Body
SUMMARY
The subject site is located in northeast Merced, on the east side of Lake Road, approximately 5,000 feet north of East Yosemite Avenue (see Location Map at Attachment B).
The Virginia Smith Trust Specific Plan would be developed in two phases (Phase 1 and Phase 2). Together, these two phases would have approximately 4,000 residential units, 44 acres of commercial (or approximately 856,200 square feet of commercial space), 78 acres of parks, 25 acres of open space and trails, and other ancillary uses.
Phase 1 has five subphases which includes Phases 1A, 1B, 1C, 1D, and 1E. Per the Development Agreement (Attachment H) and the VST Specific Plan (Attachment F), each phase is required to provide specific backbone infrastructure for circulation improvements, sewer improvements, water improvements, and storm drainage improvements.
Phase 1 D is located at south and center of the specific plan (Attachment B). Phase 1D would subdivide approximately 58.17 acres into 197 lots. As shown in the small lot map at Attachment C and the land use map at Attachment E, Phase 1D includes a variety of residential and complimentary land uses listed below:
• Low Medium Density Residential (R-1-5)
• Medium Density Residential (R-2 - Cluster)
• Neighborhood Commercial (CR - Neighborhood)
• Open Space Park
Residential Uses
The eastern portion of Phase 1D includes 20.28 acres designated for Low Medium Density Residential (R-1-5). While the western portion of Phase 1D features approximately 5.84 acres of Low Medium Density Residential (R-1-5). The southern portion of the east side of Phase 1D features a strip cluster-style residential parcels, a development type unique to VST. Cluster development typically includes two parcels fronting a public street, with two to six additional parcels located behind, accessed via a 22-foot-wide driveway easement. Standards for Cluster Unit Development are detailed within Attachment F, on Page 42 (Figure 8) of the Specific Plan.
Commercial Uses
At the northwest corner of Center Street and Cardella Road, there is an 11.46-acre parcel (Lot 39) designated for Neighborhood Commercial (CR-Neighborhood). This site is intended to include approximately 175,000 square feet of commercial development and serve nearby residents within walking distance, while also being accessible from the intersecting Golden Bobcat Avenue, Cardella Road and Center Street.
Phase 1D also includes approximately 1.61 acres of additional Village Center Commercial (Lots 37 and 40) that would complete the development of all four corners of the Virginia Smith Parkway and Center Street within the Village Center Commercial corridor.
Parks and Open Space
The Parks and Open Space Land Use Map is provided with Attachment F (Figure 4, Page 32). As shown on this attachment, Phase 1D would include 7.3 acres designated for a community recreation center towards the northwest of this phase. A couple pocket parks are also featured in this phase and a linear park along Virginia Smith Parkway through the entire frontage of this phase.
Life of Vesting Tentative Subdivision Map
According to the Development Agreement, each subdivision map has a lifespan that would go to 2054 with a possible 10-year extension out to 2064 (consistent with the duration of the Development Agreement). These maps have a longer lifespan compared to the standard 2-year subdivision map life with extensions of up to 6 years.
Findings
Attachment A includes the Draft Planning Commission Resolution, which also contains Exhibit C - Findings and Considerations. This section of the draft resolution addresses several topics related to the proposed development, including the required findings necessary to comply with General Plan and Zoning requirements.
For more detailed information, please refer to this section.
Below is a list of findings/considerations included in the draft resolution:
• Finding A - General Plan Compliance and Polices Related to this Application
• Finding B - Land Use Plan for entire VST Specific Plan
• Finding C - Land Use Plan for Phase 1D
• Finding D - Parks and Open Space
• Finding E - Building Design and Development Standards
• Finding F - Phasing Plan
• Finding G - Vesting Tentative Subdivision Map # 25-0011 Virginia Smith Trust (VST Phase 1D)
• Finding H - Infrastructure for Entire VST Specific Plan
• Finding I - Infrastructure of Phase 1D
• Finding J - City Impact Fees and Specific Plan Impact Fees
• Finding K - Vehicle Miles Traveled
• Finding L - Biological Resources
• Finding M - Agriculture Resource and Interface
• Finding N - Affordable Housing Plan
• Finding O - Tentative Subdivision Map Requirements
• Finding P- Public Comments Received
• Finding Q - Environmental Review # 25-0036
Surrounding uses as noted in Attachment B.
|
Surrounding Land |
Existing Use of Land |
City Zoning Designation |
City General Plan Land Use Designation |
|
North |
UC Merced |
Public Facility (PF) |
School (SCH) |
|
South |
Agriculture |
Merced County Jurisdiction |
UC Community Plan - South (CP) |
|
East |
Undeveloped Land |
Merced County Jurisdiction |
Outside City’s Sphere of Influence |
|
West |
Single-Family Homes/Agriculture (across Lake Road) |
Merced County Jurisdiction |
Bellevue Community Plan (CP) |
Background
In 2020, the Governor signed Assembly Bill (AB) 3312 into law. This legislation allowed the City of Merced to annex the main UC Merced campus through a “road strip” annexation and established certain restrictions on future annexations along that road strip. However, the bill generally permits annexation of sites adjacent to the UC Merced campus, such as the Virginia Smith Trust (VST) site located directly south of the campus.
On January 16, 2024, the City Council approved the Virginia Smith Specific Plan (VST) and voted to annex the site into the City limits. During the same meeting, the Council also adopted the Final Focused Supplemental Environmental Impact Report for the VST Annexation (Environmental Review #23-44), the Findings of Fact (as required by CEQA Guidelines Section 15091); and approved the Mitigation Monitoring Program and Statement of Overriding Considerations.
After the Annexation/Specific Plan is approved as part of the entitlement review process, a Large Lot Subdivision Map is prepared. The proposed Small Lot Subdivision (Phase 1A) is the next step in this entitlement process. The small lots would be the basis for more defined development like residential subdivisions. The applicant currently has five (5) small lot subdivision maps submitted for review-Phases 1A, 1B, 1C, 1D, and 1E. These maps are scheduled for subsequent Planning Commission review. Phase 2, which occupies approximately 45% of the specific plan, is shown as a “Designated Remainder” on the large lot subdivision map and may be processed at a later date.
ATTACHMENTS
A) Draft Planning Commission Resolution
B) Location Map
C) Vesting Tentative Subdivision Map for Phase 1D
D) Phasing Map with Land Use Map
E) Land Use Plan for each Phase
F) Virginia Smith Trust Specific Plan
G) VST Mitigation Measures
H) VST Development Agreement
I) UC Merced Conservation Easement for Wetlands and Fairy Shrimp
J) MMC 18.16.080 - Information Required (for Tentative Subdivision Maps)
K) Public Comments
L) Environmental Review #25-0036 - CEQA Section 15162 Findings and Categorical Exemption
M) Presentation