File #: 16-240    Version: 1 Name:
Type: Consent Item Status: Passed
File created: 5/25/2016 In control: City Council/Public Finance and Economic Development Authority/Parking Authority
On agenda: 6/20/2016 Final action: 6/20/2016
Title: SUBJECT: Administering Agency Amendment Modification Summary (E-76) for Bridge Preventative Maintenance Program (BPMP) Grant for the M & G Street at Bear Creek Bridge Repair Project 108026 REPORT IN BRIEF Consider accepting $1,707,744 in Federal grant funds for the construction costs associated with the repair of the M and G Street Bridges at Bear Creek. RECOMMENDATION City Council - Adopt a motion: A. Accepting grant revenue from a Federal Grant, through Caltrans, increasing revenue account 450-1104-324.02-00 in the amount of $1,707,744; and, B. Appropriating the same to account 450-1104-637.65-00-Project 108026 Bridge Repairs; and, C. Authorizing the City Manager or his designee to execute all necessary documents.
Attachments: 1. BPMPL-5085(034) - E76 Construction.pdf, 2. Location Map

 

Report Prepared by: John C. Sagin, Jr., AIA, Principal Architect

 

Title

SUBJECT: Administering Agency Amendment Modification Summary (E-76) for Bridge Preventative Maintenance Program (BPMP) Grant for the M & G Street at Bear Creek Bridge Repair Project 108026

 

REPORT IN BRIEF

Consider accepting $1,707,744 in Federal grant funds for the construction costs associated with the repair of the M and G Street Bridges at Bear Creek.

 

RECOMMENDATION

City Council - Adopt a motion:

 

A.  Accepting grant revenue from a Federal Grant, through Caltrans, increasing revenue account 450-1104-324.02-00 in the amount of $1,707,744; and,

 

B.  Appropriating the same to account 450-1104-637.65-00-Project 108026 Bridge Repairs; and,

 

C.  Authorizing the City Manager or his designee to execute all necessary documents.

 

Body

ALTERNATIVES

1.  Approve, as recommended by staff; or,

2.  Approve, subject to conditions other than recommended by staff (identify specific findings and/or conditions amended to be addressed in the motion); or,

3.  Deny; or,

4.  Refer to staff for reconsideration of specific items (specific items to be addressed in the motion); or,

5.  Continue to a future meeting (date and time to be specified in the motion).

 

AUTHORITY

Charter of the City of Merced, Section 200.

 

Caltrans Procedures for Administering Local Grant Projects in the State Transportation Improvement Program (STIP) are used to comply with the changes to the programming and funding statutes brought about by Chapter 622 of the Statutes of 1997 (SB 45, Kopp).  The procedures have been modified to remain consistent with and complimentary to the various guidelines and policies adopted by the California Transportation Commission (CTC), including the current 2010 STIP Guidelines (adopted on October 14, 2009).

 

CITY COUNCIL PRIORITIES

As provided for in the 2015-16 Adopted Budget.

 

DISCUSSION

The project is located at both the G Street and M Street bridges over Bear Creek and consists of the rehabilitation of both bridges to repair deteriorated conditions, prevent further deterioration of adjacent public facilities, and update facility features to comply with current design and American with Disabilities Act (ADA) standards.

 

Caltrans has sent an Amendment Modification Summary (E-76) for implementation of the bridge preventive maintenance measures on the G Street and M Street bridges over Bear Creek.  The (E-76) allows for the use of $1,707,744 in grant funding for costs associated with construction of the project.  The local match of $221,256 was included in the FY 2015/2016 Adopted Budget and no General Funds will be used.

 

HISTORY AND PAST ACTIONS

On May 20, 2013, City Council accepted a $212,472 Federal Grant, through Caltrans, for the City of Merced’s Bridge Preventive Maintenance Program (BPMP).  The local matching funds were $27,528, for a total of $240,000.  The grant provided funding for the following:

 

1.                     Preventive Maintenance for the Bear Creek Bridge at M Street (Bridge No. 39C0028);

2.                     Preventive Maintenance for the Bear Creek Bridge at G Street (Bridge No. 39C0041); and,

3.                     Development of the City’s 2014 Bridge Preventive Maintenance Program.

 

In August 2015, Council accepted an additional $88,530 in grant funds for the design and development of the project.  City staff requested additional funding to complete the project due to the deficient condition of the M Street Bridge, which requires additional work recommendations beyond a simple repair.  The existing asphalt concrete (AC) overlay on M Street is cracked, settled, and uneven.  A full removal of the AC and placement of polyester concrete overlay is required to protect the bridge structure.  The existing sidewalks and curbs are also beyond repair, and require a complete replacement.  The planters will also need to be removed, with traffic rated barriers installed.  Additional erosion control and other rehabilitation measures are also needed.

 

IMPACT ON CITY RESOURCES

Staff recommends accepting grant revenue from a Federal Grant, through Caltrans, increasing revenue account 450-1104-324.02-00 in the amount of $1,707,744, and appropriating the same to account 450-1104-637.65-00-Project 10826 Bridge Repairs for construction and construction engineering costs associated with the project. 

 

ATTACHMENTS

1.  Amendment Modification Summary (E-76), dated 5/4/2016

2.  Location Map