File #: 18-464    Version: 1 Name:
Type: Consent Item Status: Agenda Ready
File created: 9/10/2018 In control: City Council/Public Finance and Economic Development Authority/Parking Authority/Successor Agency to the Redevelopment Agency
On agenda: 10/15/2018 Final action:
Title: SUBJECT: Information Only - Overview of Bellevue Ranch REPORT IN BRIEF The City Council will receive an overview of the Bellevue Ranch project and a preview of upcoming changes. RECOMMENDATION For Information Only.
Attachments: 1. Location Map, 2. Original Land Use Map, 3. Proposed Land Use Map, 4. Presentation
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

 

Report Prepared by: Julie Nelson, Associate Planner, Development Services Department

 

Title

SUBJECT: Information Only - Overview of Bellevue Ranch

 

REPORT IN BRIEF 

The City Council will receive an overview of the Bellevue Ranch project and a preview of upcoming changes.

 

RECOMMENDATION

For Information Only.

 

Body

DISCUSSION

The Bellevue Ranch Master Development Plan (BRMDP) was originally approved in 1995 and included a 1,385-acre area (Attachment 1).  The BRMDP provided a vision and standards for the development that would include commercial, transit, and low and high density residential uses (Attachment 2).  Development within the Master Plan area was done in phases with the area east of M Street and south of Bellevue Road being the first phase to develop; this area is commonly referred to as Bellevue Ranch East.  The area west of M Street and south of Bellevue Road is commonly referred to as Bellevue Ranch West, and the area north of Bellevue Road is commonly referred to as Bellevue Ranch North.  These areas are shown on the map at Attachment 1.  Within each sub-area (East, West, North), the land was subdivided into larger parcels or villages to allow the development of subdivisions; there are a total of 36 villages within the Master Plan Area.  The proposed land use map at Attachment 3 shows the location of each of the villages within the Master Plan Area. 

 

Through the years, some of the original land uses have been changed, and currently there are changes that the developer is proposing (Attachment 3) in Bellevue Ranch West and Bellevue Ranch North.  Staff will provide an overview of past changes and proposed changes at the City Council meeting.  The proposed changes would be reviewed by both the Planning Commission and City Council at future meetings for action or recommendation to the City Council.

 

One of the greatest challenges with the development of the Bellevue Ranch area is the large amount of infrastructure needed.  There are a number of bridges, roads, and traffic signals that are needed to complete the circulation within this area.  The timing of the construction of the required infrastructure is specified in Table 6.1 of the BRMDP.  Staff is working with the developer on possible changes to the timing of the infrastructure; changes to Table 6.1 would require a General Plan Amendment and would go before the Planning Commission for recommendation prior to coming before the City Council for final action. 

 

There are many aspects to the development of the Bellevue Ranch area.  At the meeting, staff will attempt to provide some history as well as a look at future changes that will come before the City Council in order to help the Council better understand the issues with this large development.

 

ATTACHMENTS

1.  Location Map

2.  Original Land Use Map

3.  Proposed Land Uses and Villages

4.  Presentation